An AE Program Management &
Structural Engineering Company
16121 N. Meadowdale Rd
Edmonds, WA 98026
ph: 425.745.9926
alt: 206.351.2217
brian
Building B431 Seismic Upgrade Puget Sound Naval Shipyard, Bremerton, WA: SCBC Principal Brian Moll worked alongside KPFF / Blue Trident Structural team for the Seismic Upgrade Design. This project includes seismic upgrades to the entire facility including the original building structure built in 1934 and added structures on the East, West and South Side. Size/ Cost: $ECC 80 Million, 6 Stories w/ Crane bays, 560,000 sq. ft.
Pierce County Readiness Center Camp Murray, WA. SCBC as part of the Blue Trident Team provided Structural Independent Technical Review for the Absher Design-Build Team. ECC $29 Million, 81,000SF
WAATS -Combat Mission Simulator Facility` Silverbell ARNG Heliport, Marana, AZ Size/ Cost: $6.2 Million, 2 story + high bay, 46000 sq. ft.
BEQ Bremerton P-283* Puget Sound Naval Shipyard, Bremerton, WA
Size/ Cost: $12 Million, Housing units floors 2-12@ 83500 sq ft, Support services and parking @ level 1 and additional 2 stories below grade parking @ 66000 sq ft.
Flight Simulator Addition McChord* McChord, Air Force Base Tacoma, WA Size/ Cost: $1.5 Million, High Bay with mezzanine, 4060 sq ft.
Fort Lewis Command Headquarters*
Ft. Lewis Military Base, Tacoma, WA Work Performed:Structural Design and Detailing to 35% submittal stage, Proj Halted for Future Scope Update.
BEQ II Bremerton P-297* Puget Sound Naval Shipyard, Bremerton, WA Size/ Cost:$12.7 Million, Housing units floors 1-4@ 81300 sq ft, Support services and parking @ level 1 and additional 2 stories below grade parking @ 69300 sq ft.
300 Man Barracks* Ft. Lewis, WA Size/ Cost: $13 Million, 3 story,110000 sq. ft.+/-
Flight Simulator Facility*Fairchild Air Force Base, Spokane, WA Size/ Cost: $4 Million ,2 story, 24000 sq. ft.
Squadron Operations* Fairchild Air Force Base, Spokane, WA Size/ Cost: $5.5 Million, 2 story, 40900 sq. ft.
Squadron Operations* McChord Air Force Base, Ft. Lewis, WA Size/ Cost: $5.0 Million, 2 story, 33000 sq. ft.
B-1 Bed Down Project* Mt. Home Air Force Base, ID Work Performed: Seismic Study
KC-135 Squadron Operations II* Fairchild AFB, Spokane, WA Size/ Cost: $5.6 Million,2-story, 40900 sq ft,
C-17 Maintenance Training Facility* McChord, AFB, Ft. Lewis, WA Size/ Cost: $5.0 Million, 1 story, 34336 sq. ft. [3190 Sq m]
Physical Fitness Center P-277* Puget Sound Naval Shipyard, Bremerton, WA Size/ Cost: $7.6 Million,1-Story+ Significant Mechanical Mezzanine ,44078 Sq. Ft. Design-Build w/ Howard S. Wright
BEQ Fallon P-322* Naval Air Station, Fallon, NV Size/ Cost: $13.3 Million, Housing units 3 stories, Support services 1 story, 71041 Sq. Ft.[6600 Sq m]
KC-135 Squadron Operations III* Fairchild AFB, Spokane, WA Size/ Cost: $5.6 Million,2-story, 40900 sq ft,
Squadron Operations II* McChord Air Force Base, Ft. Lewis, WA Size/ Cost: $5.2 Million, 2 story, 33000 sq. ft.
KC-135 Squadron Operations IV* Fairchild AFB, Spokane, WA Size/ Cost:$4.9 Million,2-story, 40900 sq ft,
Squadron Operations III* McChord Air Force Base, Ft. Lewis, WA Size/ Cost: $5.2 Million, 2 story, 41200 sq. ft.
Squadron Operations IV* McChord,AFB, Ft. Lewis, WA Size/ Cost: $5.5 Million, 2 story, 31000 sq. ft.
Enhanced Training in Idaho* Mountain Home,AFB, ID Size/ Cost: $17.7 Million, Multiple structures,7000 sq ft Maint Complex, 400 sq ft Generator Bldg, 500 sq ft Pump House, 500 sq ft Emitter bldgs. Design-Build: RSCI of Boise ,Idaho
Redhorse Medical Training facility* Camp Murray,ANG, FT. Lewis, WA 2 story, Structural Design and Detailing to 30% submittal
Information Warfare Agressor Squadron (IWAS)* McChord,AFB, FT. Lewis, WA Size/ Cost:3 story, 23,000 sq. ft. Work Performed: Structural Design and Detailing to 35% submittal, Metric Project Halted Due to Site Change
Geiger Heights Water Tower* Fairchild AFB, Spokane, WA Work Performed: ( Industrial ) OSHA study, and Structural Design and detailing of added ladder,cage and access platform.
Golf Maintenance Facility* McChord AFB,Ft. Lewis, WA Size/ Cost: 1 story, preengineered Metal Building, 7000 sq ft + 1200 sq ft Canopy
Add Covered Storage* McChord AFB,Ft. Lewis, WA Size/ Cost:924 sq meter (10,000 sq feet), 1 story, preengineered Metal Canopy on Concrete Pedestals up to 7’ in height
Gymnasium for Naval Post-Graduate School* Naval Post-Graduate School, Monterey, CA Size/ Cost: $4.5 Million, 1 story, 1875 sq meter (20200 sq ft.) Design-Build w/ Howard S. Wright ,Sacramento,CA
Convert Commercial Gate* Malmstrom AFB,Great Falls,MT Size/ Cost: 1 story, CMU Guard Bldg 31 sq meter (335 sq ft)and 380 Sq Meter (4100 sq ft) Canopy over Gate
Helicopter Operations Facility* Malmstrom AFB,Great Falls,MT Size/ Cost: 2 story, 10000 Sq. Ft. Structural Design and Detailing, Metric :Taken to 35% for RFP, then put out for Design-Build
Child Development Center* Malmstrom AFB,Great Falls,MT Size/ Cost: $8.7 Million, 1 story, 1774 Sq Meter (19100 Sq. Ft.)
Family Housing : Phases 6A, 3, and IV* Malmstrom AFB,Great Falls,MT Size/ Cost: $22 Million +/-, 2 story, 2,3,& 4 bedroom duplexes
Howard Hansen Dam* Enumclaw, WA Work Performed: Assist USACE Seattle w/ Misc stop logs and flood gates,provide detail sketches
Battalion-FY02 Whole Barracks Renewal* Ft. Lewis, WA Size/ Cost:$4 Million, 2 story, 1308 Sq. Meters (14100 Sq. Ft)
C-17 Maintenance Training Facility Addition* McChord AFB,Ft. Lewis, WA Size/ Cost: 1 story, Small Additions to previously designed facility
FY04 Whole Barracks Renewal* Ft. Lewis, WA
Barracks- Size/Cost: 3 story, 10200 SM (110000 SF) Designed to meet USACE requirements for AT/FP and Progressive Collapse. Won 2007 SAME Design Excellence Award
Battalion- Size/Cost 2 Story, 1680 SM ( 18100 Sq. Ft.)
Overall Construction cost $44.5 Million. Design-Build:Absher Construction
Barracks-FY05 Whole Barracks Renewal* Ft. Lewis, WA Size/ Cost: $17 Million, 3 story, xxx Sq. Ft Design-Build: Absher Construction
Resistance Training Facility* Fairchild,AFB Work Performed: Structural Design and Detailing for RFP document and pricing
FY06 Whole Barracks Renewal [Barracks/Battalions/Company Operations]* Fort Lewis, WA Work Performed: Structural Design and Detailing for Design-Build Bid document and pricing submission
Barracks (6800SM), Battalion (1490 SM per bldg), Company Operations (2270 SM per bldg)
Design-Build: Absher Construction Note: The Design Build team was successful in winning this project
Ft. Lewis Chapel* Ft. Lewis, WA Struct System:Preengineered Metal Building Work Performed: Structural Design and Detailing for Design-Build Bid document and pricing submission. Design-Build: Berschauer Phillips Construction. Note: The Design Build team was successful in winning this project, instrumental in this was SCBC Principal suggestion to go with a pre-engineered metal building to get project within budget.
FY07 Whole Barracks Renewal Stryker Avenue [Barracks/Battalions/Company Operations]^ Fort Lewis, WA Work Performed: Structural Design and Detailing for Design-Build Bid document and pricing submission
Design-Build: Bristol Construction Note: Project did not move forward at the time due to lack of adequate funding.
* Performed while employed at previous firm WJA/Tetratech
` Performed while employed at previous firm DMJM
^ Performed while employed at CEI
Copyright 2009 SCBC Engineering, PLLC.. All rights reserved.
16121 N. Meadowdale Rd
Edmonds, WA 98026
ph: 425.745.9926
alt: 206.351.2217
brian